Material Properties · Physical Properties

Coordinate Measuring Machine Dimensional Metrology (CMM)

CMM dimensional inspection against CAD or drawings, with datums, tolerances, accessible features and the measurement report agreed before quotation.

  • Drawing-based dimensional inspection
  • Datum and geometric-tolerance review
  • Component-to-CAD comparison
  • Drawing-based dimensional inspection
Representative Coordinate Measuring Machine Dimensional Metrology equipment selected for the TESTDOG service catalogue
Price
Request Quote
Scope reviewed before quotationA £45 service fee applies to orders under £300, excluding VAT.
Turnaround
8–12 working days
Preparation and scope dependent
Available platforms
ZEISS CONTURA
Typical outputs
Dimension and deviation tableAgreed tolerance assessmentAnnotated feature referencesAlignment and probing record

Why this service

What CMM can help you understand

Coordinate metrology measures defined component features in an agreed reference frame. Inspection planning starts with the drawing revision, datums and tolerances, rather than a generic material-property test.

01

Drawing-based dimensional inspection

Drawing-based dimensional inspection

02

Datum and geometric-tolerance review

Datum and geometric-tolerance review

03

Component-to-CAD comparison

Component-to-CAD comparison

Choose the scope

Start from the question, not the tool

The method, preparation route and reporting depth depend on what you need to decide.

Drawing-based dimensional inspection

Drawing-based dimensional inspection

Best used when
Drawing-based dimensional inspection
Typical result
Dimension and deviation table
Preparation note
Inaccessible features, compliant parts and uncertain datums can limit the inspection.

Common outputs

A result package matched to the decision you need to make

Fields, conditions, processing and file formats are confirmed before work begins.

StandardDimension and deviation table

Dimension and deviation table reported with the agreed units, sample reference and measurement conditions.

StandardAgreed tolerance assessment

Agreed tolerance assessment supplied in a labelled format suitable for direct sample or condition comparison.

OptionalAnnotated feature references

Annotated feature references provided with the processing basis and quality checks agreed during technical review.

OptionalAlignment and probing record

Alignment and probing record included when selected in the confirmed reporting scope.

Sample requirements

What to provide before work begins

Provide representative, clearly labelled samples and identify the decision, feature or comparison that matters.

Suitable sampleSubmission requirementPlanning note
Stable solid componentsProvide the drawing revision or CAD model, units, datums and nominated dimensions.Inaccessible features, compliant parts and uncertain datums can limit the inspection.
Fixtures and assembled parts with accessible featuresIdentify tolerances, feature count, part quantity and any required report format.Pass/fail statements need agreed tolerances and an applicable decision rule; measurement uncertainty is reviewed for the task.
Stable solid componentsState part dimensions, material, surface condition, fixturing constraints and probing access.Inaccessible features, compliant parts and uncertain datums can limit the inspection.

Objective: state the decision, comparison or acceptance criterion the work must support.

Handling and access: declare hazards, instability, confidentiality, file constraints or special logistics before dispatch or transfer.

Questions and answers

Common planning decisions

Short answers to issues that can change preparation, scope, timing or interpretation.

Can I enquire without CAD?

Yes. Supply a dimensioned drawing or identify the features and reference frame. The laboratory reviews whether a defensible inspection plan can be defined.

Does the report cover every feature?

Only the nominated and accepted features are inspected. Agree tolerances, datum alignment and any tolerance-assessment decision rule before testing.

Configure the service

Send the information needed to scope CMM correctly

  • Sample form, material, dimensions and quantity
  • Feature or decision the result must address
  • Required comparison, acceptance criterion or reference
  • Preferred output and reporting depth
CMM analysisRequest Quote

A £45 service fee applies to orders under £300, excluding VAT.

Typical turnaround: 8–12 working days

Configure & Book