Which process dominates resistance or time-dependent response?
Frequency sweep
Performance Testing · Electrical & Electrochemical
Resolve resistive, capacitive and transport processes using impedance magnitude and phase across frequency.
Why this service
Electrical and electrochemical impedance spectroscopy applies a small AC perturbation across frequency. Nyquist and Bode responses can separate bulk, interface, diffusion and contact contributions when…
Frequency sweep
Bias or temperature-dependent EIS
Equivalent-circuit comparison
Choose the scope
The method, preparation route and reporting depth depend on what you need to decide.
Which process dominates resistance or time-dependent response?
How do interfaces, ageing or temperature change impedance?
Can an equivalent circuit support a defensible comparison?
Common outputs
Fields, conditions, processing and file formats are confirmed before work begins.
Nyquist plot reported with the agreed units, sample reference and measurement conditions.
Bode magnitude and phase supplied in a labelled format suitable for direct sample or condition comparison.
Fitted circuit parameters where justified provided with the processing basis and quality checks agreed during technical review.
Frequency, amplitude and bias conditions included when selected in the confirmed reporting scope.
Sample requirements
Provide representative, clearly labelled samples and identify the decision, feature or comparison that matters.
| Suitable sample | Submission requirement | Planning note |
|---|---|---|
| Biological / soft material | Provide fixed, preserved or otherwise stabilised material in the agreed container and medium. | Declare biological hazards and confirm fixation, dehydration, temperature and disposal requirements. |
| Test coupon / specimen | Provide labelled specimens prepared to the agreed geometry, orientation and surface condition. | Confirm the applicable standard, dimensions, loading direction and number of replicates. |
| Device / assembly | Provide a complete labelled device or assembly with drawings, interfaces and operating limits. | Confirm power, connections, operating state, access restrictions and permitted disassembly. |
Objective: state the decision, comparison or acceptance criterion the work must support.
Handling and access: declare hazards, instability, confidentiality, file constraints or special logistics before dispatch or transfer.
Questions and answers
Short answers to issues that can change preparation, scope, timing or interpretation.
Basic fitting can be included when a physically justified model is agreed; complex model development is quoted separately.
Typical turnaround is 6 working days after sample acceptance and method confirmation.
Configure the service