Performance Testing · Electrical & Electrochemical

Electrical Resistivity, Conductivity and Four-Point Probe Measurement (Resistivity/4PP)

Measure sheet resistance, bulk resistivity or conductivity while reducing contact-resistance error.

  • What is the sheet resistance or bulk…
  • How uniform is a coating or wafer?
  • How do processing and thickness affect…
  • Single-point measurement
Four-point probe resistivity measurement system
Price
from£210
per sample, excl. VAT
Turnaround
5 working days
Preparation and scope dependent
Available platforms
Jandel RM3000+
Typical outputs
Sheet resistanceBulk resistivity or conductivityPoint-to-point uniformityProbe, current and geometry record

Why this service

What Resistivity/4PP can help you understand

A four-point probe passes current through the outer probes and measures voltage through the inner pair. With the correct geometry and correction factor, it provides sheet resistance or bulk resistivity…

01

What is the sheet resistance or bulk resistivity?

Single-point measurement

02

How uniform is a coating or wafer?

Multi-point uniformity map

03

How do processing and thickness affect conductivity?

Temperature or process comparison

Choose the scope

Start from the question, not the tool

The method, preparation route and reporting depth depend on what you need to decide.

Single-point measurement

What is the sheet resistance or bulk resistivity?

Best used when
What is the sheet resistance or bulk resistivity?
Typical result
Sheet resistance
Preparation note
Declare biological hazards and confirm fixation, dehydration, temperature and disposal requirements.

Common outputs

A result package matched to the decision you need to make

Fields, conditions, processing and file formats are confirmed before work begins.

StandardSheet resistance

Sheet resistance reported with the agreed units, sample reference and measurement conditions.

StandardBulk resistivity or conductivity

Bulk resistivity or conductivity supplied in a labelled format suitable for direct sample or condition comparison.

OptionalPoint-to-point uniformity

Point-to-point uniformity provided with the processing basis and quality checks agreed during technical review.

OptionalProbe, current and geometry record

Probe, current and geometry record included when selected in the confirmed reporting scope.

Sample requirements

What to provide before work begins

Provide representative, clearly labelled samples and identify the decision, feature or comparison that matters.

Suitable sampleSubmission requirementPlanning note
Biological / soft materialProvide fixed, preserved or otherwise stabilised material in the agreed container and medium.Declare biological hazards and confirm fixation, dehydration, temperature and disposal requirements.
Test coupon / specimenProvide labelled specimens prepared to the agreed geometry, orientation and surface condition.Confirm the applicable standard, dimensions, loading direction and number of replicates.
Device / assemblyProvide a complete labelled device or assembly with drawings, interfaces and operating limits.Confirm power, connections, operating state, access restrictions and permitted disassembly.

Objective: state the decision, comparison or acceptance criterion the work must support.

Handling and access: declare hazards, instability, confidentiality, file constraints or special logistics before dispatch or transfer.

Questions and answers

Common planning decisions

Short answers to issues that can change preparation, scope, timing or interpretation.

What is the difference between sheet resistance and resistivity?

Sheet resistance describes a thin layer in ohms per square; bulk resistivity also requires thickness and geometry.

What is the typical turnaround?

Typical turnaround is 5 working days after sample acceptance and method confirmation.

Configure the service

Send the information needed to scope Resistivity/4PP correctly

  • Sample form, material, dimensions and quantity
  • Feature or decision the result must address
  • Required comparison, acceptance criterion or reference
  • Preferred output and reporting depth
Resistivity/4PP analysisfrom£210

Typical turnaround: 5 working days

Configure & Book