What overpotential or half-wave potential is achieved?
Activity screening
Performance Testing · Electrical & Electrochemical
Compare ORR, OER or HER activity, kinetics and stability under a controlled electrochemical protocol.
Why this service
Electrocatalytic performance testing uses techniques such as LSV, CV, EIS, chronoamperometry and rotating electrodes. The protocol is selected for the target reaction and must control catalyst loading,…
Activity screening
RDE or RRDE kinetics
Durability programme
Choose the scope
The method, preparation route and reporting depth depend on what you need to decide.
What overpotential or half-wave potential is achieved?
How do kinetic and transport contributions compare?
How stable is the catalyst during cycling or sustained operation?
Common outputs
Fields, conditions, processing and file formats are confirmed before work begins.
Polarisation curve reported with the agreed units, sample reference and measurement conditions.
Tafel slope and kinetic metrics supplied in a labelled format suitable for direct sample or condition comparison.
RDE or RRDE analysis provided with the processing basis and quality checks agreed during technical review.
Stability and retention data included when selected in the confirmed reporting scope.
Sample requirements
Provide representative, clearly labelled samples and identify the decision, feature or comparison that matters.
| Suitable sample | Submission requirement | Planning note |
|---|---|---|
| Biological / soft material | Provide fixed, preserved or otherwise stabilised material in the agreed container and medium. | Declare biological hazards and confirm fixation, dehydration, temperature and disposal requirements. |
| Test coupon / specimen | Provide labelled specimens prepared to the agreed geometry, orientation and surface condition. | Confirm the applicable standard, dimensions, loading direction and number of replicates. |
| Device / assembly | Provide a complete labelled device or assembly with drawings, interfaces and operating limits. | Confirm power, connections, operating state, access restrictions and permitted disassembly. |
Objective: state the decision, comparison or acceptance criterion the work must support.
Handling and access: declare hazards, instability, confidentiality, file constraints or special logistics before dispatch or transfer.
Questions and answers
Short answers to issues that can change preparation, scope, timing or interpretation.
No. Each reaction needs its own electrolyte, potential window, electrode configuration and reporting metrics.
Typical turnaround is 8 working days after sample acceptance and method confirmation.
Configure the service