What are the corrosion potential and corrosion-current indicators?
Potentiodynamic polarisation
Performance Testing · Electrical & Electrochemical
Quantify corrosion tendency and protection using open-circuit, polarisation and impedance measurements.
Why this service
Electrochemical corrosion testing examines the response of a material or coating in a defined electrolyte. Tafel, linear polarisation resistance and EIS routes provide different information and are…
Potentiodynamic polarisation
Linear polarisation resistance
Corrosion EIS and exposure study
Choose the scope
The method, preparation route and reporting depth depend on what you need to decide.
What are the corrosion potential and corrosion-current indicators?
How effective is a coating or inhibitor?
How does corrosion behaviour evolve with exposure time?
Common outputs
Fields, conditions, processing and file formats are confirmed before work begins.
Open-circuit potential reported with the agreed units, sample reference and measurement conditions.
Polarisation or Tafel curve supplied in a labelled format suitable for direct sample or condition comparison.
Corrosion current or polarisation resistance provided with the processing basis and quality checks agreed during technical review.
Nyquist and Bode plots included when selected in the confirmed reporting scope.
Sample requirements
Provide representative, clearly labelled samples and identify the decision, feature or comparison that matters.
| Suitable sample | Submission requirement | Planning note |
|---|---|---|
| Biological / soft material | Provide fixed, preserved or otherwise stabilised material in the agreed container and medium. | Declare biological hazards and confirm fixation, dehydration, temperature and disposal requirements. |
| Test coupon / specimen | Provide labelled specimens prepared to the agreed geometry, orientation and surface condition. | Confirm the applicable standard, dimensions, loading direction and number of replicates. |
| Device / assembly | Provide a complete labelled device or assembly with drawings, interfaces and operating limits. | Confirm power, connections, operating state, access restrictions and permitted disassembly. |
Objective: state the decision, comparison or acceptance criterion the work must support.
Handling and access: declare hazards, instability, confidentiality, file constraints or special logistics before dispatch or transfer.
Questions and answers
Short answers to issues that can change preparation, scope, timing or interpretation.
Use the decision to choose: rapid tendency, rate indicator, coating barrier response or time-dependent degradation.
Typical turnaround is 8 working days after sample acceptance and method confirmation.
Configure the service