Performance Testing · Electrical & Electrochemical

Solar-Cell I-V and Performance Testing (Solar I-V)

Measure illuminated and dark J-V response, photovoltaic efficiency and device-to-device variation.

  • What efficiency, Voc, Jsc and fill factor…
  • Is hysteresis or series/shunt resistance…
  • How consistent are pixels, devices or…
  • Illuminated J-V
Solar-cell current-voltage test system
Price
from£150
per sample, excl. VAT
Turnaround
8 working days
Preparation and scope dependent
Available platforms
Ossila Solar Cell I-V Test SystemZolix solarIV-300A
Typical outputs
J-V curveVoc, Jsc, fill factor and efficiencySeries and shunt resistance indicatorsDark, reverse-scan or stability comparison

Why this service

What Solar I-V can help you understand

Solar-cell I-V testing sweeps voltage while current is measured under controlled illumination and, where selected, in the dark. Reliable performance metrics depend on calibrated irradiance, active area,…

01

What efficiency, Voc, Jsc and fill factor does the device achieve?

Illuminated J-V

02

Is hysteresis or series/shunt resistance limiting performance?

Dark and light J-V

03

How consistent are pixels, devices or ageing conditions?

Pixel, hysteresis or stability comparison

Choose the scope

Start from the question, not the tool

The method, preparation route and reporting depth depend on what you need to decide.

Illuminated J-V

What efficiency, Voc, Jsc and fill factor does the device achieve?

Best used when
What efficiency, Voc, Jsc and fill factor does the device achieve?
Typical result
J-V curve
Preparation note
Declare biological hazards and confirm fixation, dehydration, temperature and disposal requirements.

Common outputs

A result package matched to the decision you need to make

Fields, conditions, processing and file formats are confirmed before work begins.

StandardJ-V curve

J-V curve reported with the agreed units, sample reference and measurement conditions.

StandardVoc, Jsc, fill factor and efficiency

Voc, Jsc, fill factor and efficiency supplied in a labelled format suitable for direct sample or condition comparison.

OptionalSeries and shunt resistance indicators

Series and shunt resistance indicators provided with the processing basis and quality checks agreed during technical review.

OptionalDark, reverse-scan or stability comparison

Dark, reverse-scan or stability comparison included when selected in the confirmed reporting scope.

Sample requirements

What to provide before work begins

Provide representative, clearly labelled samples and identify the decision, feature or comparison that matters.

Suitable sampleSubmission requirementPlanning note
Biological / soft materialProvide fixed, preserved or otherwise stabilised material in the agreed container and medium.Declare biological hazards and confirm fixation, dehydration, temperature and disposal requirements.
Test coupon / specimenProvide labelled specimens prepared to the agreed geometry, orientation and surface condition.Confirm the applicable standard, dimensions, loading direction and number of replicates.
Device / assemblyProvide a complete labelled device or assembly with drawings, interfaces and operating limits.Confirm power, connections, operating state, access restrictions and permitted disassembly.

Objective: state the decision, comparison or acceptance criterion the work must support.

Handling and access: declare hazards, instability, confidentiality, file constraints or special logistics before dispatch or transfer.

Questions and answers

Common planning decisions

Short answers to issues that can change preparation, scope, timing or interpretation.

Is EQE included in Solar I-V?

No. EQE is a separate optical-spectral measurement unless explicitly added.

What is the typical turnaround?

Typical turnaround is 8 working days after sample acceptance and method confirmation.

Configure the service

Send the information needed to scope Solar I-V correctly

  • Sample form, material, dimensions and quantity
  • Feature or decision the result must address
  • Required comparison, acceptance criterion or reference
  • Preferred output and reporting depth
Solar I-V analysisfrom£150

Typical turnaround: 8 working days

Configure & Book